BTC $77,607.63 +1.36%
ETH $2,396.04 +1.07%
BNB $703.02 +2.92%
XRP $1.36 +3.30%
SOL $100.21 +1.93%
TRX $0.3273 +1.39%
DOGE $0.0829 +2.72%
ADA $0.2068 +6.90%
BCH $249.10 +2.16%
LINK $11.19 +1.66%
HYPE $81.68 +0.49%
AAVE $129.41 +2.16%
SUI $0.7621 +6.99%
XLM $0.1769 +2.61%
ZEC $830.24 +3.24%
BTC $77,607.63 +1.36%
ETH $2,396.04 +1.07%
BNB $703.02 +2.92%
XRP $1.36 +3.30%
SOL $100.21 +1.93%
TRX $0.3273 +1.39%
DOGE $0.0829 +2.72%
ADA $0.2068 +6.90%
BCH $249.10 +2.16%
LINK $11.19 +1.66%
HYPE $81.68 +0.49%
AAVE $129.41 +2.16%
SUI $0.7621 +6.99%
XLM $0.1769 +2.61%
ZEC $830.24 +3.24%

伯恩斯坦:IREN AI 云业务 2030 年或达 170 亿美元,预计 2026 年底前停止 BTC 挖矿

2026-09-03 16:34:54

ChainCatcher 消息,据 The Block 报道,伯恩斯坦预计比特币矿企 IREN 到 2030 年 AI 云业务年收入可达 170 亿美元,届时云容量将扩大至约 2 吉瓦。

伯恩斯坦预计 IREN 将于 2026 年底前停止比特币挖矿业务,并指出三年期 AI 云合同定价自去年 11 月以来已上涨约 125%。

app_icon
ChainCatcher 与创新者共建Web3世界